Commercial and Industrial Standard Offer ProgramIncentives are offered to participants (Project Sponsors) who install energy efficient retrofit projects in commercial and industrial facilities. This program also accepts new construction projects, which exceed minimum energy efficiency standards. 

A qualifying facility will be one with a peak demand of at least 100 kW at a single site or a combined peak demand of at least 250 kW at multiple sites. Each project must achieve a minimum summer peak demand reduction of 20 kW or 120,000kWh.

Incentives are paid to project sponsors for verified demand and energy savings. Project sponsors may be any company, contractor, or customer who installs energy efficiency measures.

For more information, please email our program contact at cisop@CenterPointEnergy.com.

Sponsor Participation Process

  • Register to participate as a project sponsor using ETrack
  • Use ETrack to develop and submit a Project Application and request funding for your project
  • Enter into a Standard Agreement with CenterPoint Energy and submit an application deposit 
  • Install proposed measures
  • Use ETrack to submit an Installation Report and request an initial payment
  • Use ETrack to submit a Savings Report and request the final payment

Incentives

  • Paid on kW and kWh reductions; vary by measure type
  • Initial Payment of 40 percent will be made after measures have been installed and inspected.
  • Final payment of up to 60 percent will be made upon approval of the Savings Report.

Measurement and Verification (M&V)

Project sponsors are responsible for conducting all project M&V.
M&V approaches can be classified according to their relative level of detail and rigor; this program involves three distinct M&V approaches:

  1. Deemed - predetermined energy savings values for particular applications
  2. Simple M&V - energy savings are based on typical equipment characteristics and some short-term testing or simple metering
  3. Full M&V - requires project-specific plan developed in accordance with International Performance Measurement and Verification Protocol

Additional  Program Information

2014 C&I Workshop Presentation

2014 C&I Program Manual

2014 Lighting Workbook

2014 Lighting Video – Macro

2014 Lighting Video – Customer

2014 Lighting Video – Schedule

2014 Lighting Video – Project

2014 ACE Tool (Replaces CalcSmart) 

2014 AHU VFD Survey 

2014 Glass Replacement Worksheet

2014 Motor Equipment Form

2014 Prescriptive Motor Form

2014 Roofing Worksheet

2014 Window Film Worksheet

2014 Other Measures Survey Form

Rules and Requirements

Enrollment and Participation Process

Incentives

Measurement and Verification

Participating Sponsors

CenterPoint Energy Houston Electric Service Area Map